30 ton explosion proof rail transfer cars for sandblasting room
Chemical Safety Audit Program: FY 1991 Status Report
Each car takes approximately six hours to fill. There is no capture system to contain liquid spilled in the loading shed. Normally, ten filled cars (179,000 to 180,000 pounds each) accumulate on the rail siding before being removed. Chloropicrin is loaded onto 30-ton railroad cars in the loading shed.
lawfilesext.leg.wa.gov
(30) “)) Mercerizing range ((” generally means)). A 3-bowl mangle, a tenter frame, and a number of boxes ...